BIDDING HAS ENDED FOR THIS PROJECT. THANK YOU.
PROJECT: South Campus Library Facility Addition at Syracuse University
BID DUE: Friday, June 4, 2021 @ 12 NOON
Hueber-Breuer Construction Co., Inc. is hereby requesting BIDS for South Campus Library Facility Addition at Syracuse University
BIDS will be received by:
Kim Neuman kneuman@hb1872.build
SUMMARY OF WORK:
The project base bid consists of a 14,000 SF Steel Structure Addition to the existing SU Library Storage Facility as well as an alternate bid for a 5,000 SF Steel Structure Addition to the Office portion for a Digital Production Studio (DPL). Some demolition of existing finishes, MEPs, and roofing fascia. Foundations consist of standard footers, piers, walls with a structural steel structure above with CFMF and IMP façade. The base bid will consist of high density storage with a recessed slab in an open structure with an EPDM roof on metal deck. MEPs consist of a new sprinkler system tying into the existing system, a new ACU with fabric duct throughout, lighting and power to equipment. Alternate bid for the DPL Studio includes standard footers, piers, and walls with structural steel structure above with CFMF and IMP Façade. Production studio rooms consists of sound-proof rooms with many acoustic features, production equipment and insulation. MEPs consist of RTU, VAVs, lighting, power digital and MEP equipment, some MEP demolitions, and bathrooms. Exterior improvements include new paving, striping, sidewalks, landscaping, and lighting (including some relocations. All interiors finishes and equipment are to be protected or replaced per contract documents. All work mentioned above is supplemental information to what is outlined in the contract documents.
ALL BIDS AND ALTERNATES MUST BE SUBMITTED AS
A. Bid for all materials and supplies
B. Bid for all labor and work, excluding materials and supplies
C. Total Bid Sum, total of (A) plus (B)
Alternate 1: Construction of the entire Digital Production Lab
A. Bid for all materials and supplies
B. Bid for all labor and work, excluding materials and supplies
C. Total Bid Sum, total of (A) plus (B)
Plans, specs and addenda are available:
For download: | HB ftp server: | http://files.hueber-breuer.com/ Username: SUSCL Password: 21670 | |
For purchase: | Plan and Print | www.planandprint.com | 315-437-5111 |
Syracuse Blue Print | www.syracuseblueprint.com | 315-476-4084 | |
Liverpool Blue Print | www.liverpoolblue.com | 315-457-0472 |
SCHEDULE:
START: Mid July 2021
COMPLETION: January 31, 2022
Insurance Requirements: SEE ATTACHED SAMPLE FOR REQUIREMENTS
NYS Sales & Use Tax Status: Tax Exempt
NYSDOL Prevailing Wages: Not Required
M/WBE Participation: YES 5% MBE and 5% WBE
Performance & Payment Bonds: Not Required
QUESTIONS REGARDING THIS BID SHALL BE SUBMITTED IN WRITING VIA EMAIL TO:
John Michael Duby: jduby@hb1872.build
PROJECT: South Campus Library Facility Addition at Syracuse University
BID DUE: Thursday, June 3, 2021 @ 12 NOON
Hueber-Breuer Construction Co., Inc. is hereby requesting BIDS for South Campus Library Facility Addition at Syracuse University
BIDS will be received by:
Kim Neuman kneuman@hb1872.build
SUMMARY OF WORK:
The project base bid consists of a 14,000 SF Steel Structure Addition to the existing SU Library Storage Facility as well as an alternate bid for a 5,000 SF Steel Structure Addition to the Office portion for a Digital Production Studio (DPL). Some demolition of existing finishes, MEPs, and roofing fascia. Foundations consist of standard footers, piers, walls with a structural steel structure above with CFMF and IMP façade. The base bid will consist of high density storage with a recessed slab in an open structure with an EPDM roof on metal deck. MEPs consist of a new sprinkler system tying into the existing system, a new ACU with fabric duct throughout, lighting and power to equipment. Alternate bid for the DPL Studio includes standard footers, piers, and walls with structural steel structure above with CFMF and IMP Façade. Production studio rooms consists of sound-proof rooms with many acoustic features, production equipment and insulation. MEPs consist of RTU, VAVs, lighting, power digital and MEP equipment, some MEP demolitions, and bathrooms. Exterior improvements include new paving, striping, sidewalks, landscaping, and lighting (including some relocations. All interiors finishes and equipment are to be protected or replaced per contract documents. All work mentioned above is supplemental information to what is outlined in the contract documents.
ALL BIDS AND ALTERNATES MUST BE SUBMITTED AS
A. Bid for all materials and supplies
B. Bid for all labor and work, excluding materials and supplies
C. Total Bid Sum, total of (A) plus (B)
Alternate 1: Construction of the entire Digital Production Lab
A. Bid for all materials and supplies
B. Bid for all labor and work, excluding
Plans, specs and addenda are available:
For download: |
HB ftp server: http://files.hueber-breuer.com/ Username: SUSCL Password: 21670 |
For purchase: |
Plan and Print www.planandprint.com 315-437-5111 |
Syracuse Blue Print www.syracuseblueprint.com 315-476-4084 |
Liverpool Blue Print www.liverpoolblue.com 315-457-0472 |
SCHEDULE:
START: Mid July 2021 COMPLETION: January 31, 2022
Insurance Requirements: SEE ATTACHED SAMPLE FOR REQUIREMENTS
NYS Sales & Use Tax Status: Tax Exempt
NYSDOL Prevailing Wages: NOT Required
M/WBE Participation: YES 5% MBE and 5% WBE
Performance & Payment Bonds: Not Required
QUESTIONS REGARDING THIS BID SHALL BE SUBMITTED IN WRITING VIA EMAIL TO:
John Michael Duby: jduby@hb1872.build